Goal: to determine position of stations ATCA, MOPRA, CEDUNA with accuracy
1—10 cm. Text of the proposal.
Duration: 12 hours. Sky frequency: K-band (22.4 GHZ).
Main results
Site positions
Formal errors for site positions are: ± 10 — 30 mm
for the vertical component and ± 3 — 6 mm for horizontal
components.